Summary
Overview
Work History
Education
Skills
Timeline
Generic

Nicholas Linden

Keenesburg

Summary

With a proven track record at Colorado Mechanical Systems, I've significantly contributed to project successes, showcasing expertise in commercial plumbing and hydronic piping systems. My leadership, demonstrated through rapid promotions and successful project completions, pairs with a strong foundation in quality control and deadline management, ensuring project excellence and client satisfaction.

Overview

16
16
years of professional experience

Work History

Project Superintendent

Colorado Mechanical Systems
05.2015 - Current

I started with this company as a installer and with in a year I was promoted to foreman and than general foreman. under this roll as foreman I oversaw daily operations of my jobsite, daily reports, three week projections, sub meetings, safety and all typical tasks of a foreman running jobs with a bid value of under $2,000,000. I was promoted to project superintendent in 2022. Most job tasks stayed the same but my crew sizes jumped from 10 to at the highest 35 and project size jumped to $9,000,000

Avalon bay governor's park

This brand new 15 story 304 apartment unit high rise building utilized a cast in place concrete structure, PT cable decks along with millenium cad framing. On this project I over saw all plumbing along with subbed pex crew and close to half way in the project I took over the VRF piping system. This project I believe is still the biggest VRF project in the state of Colorado. This project used Stainless steel grooved domestic piping along with uponor pex, cast iron dwv and 8" main gas line going all the way up to the roof serving 4, 250 gallon water heaters that we pre fabbed on a skid and used the tower crane to place. This was a fully BIM modeled job.

Isle of capri casino buffet

Complete remodel of plumbing systems including grease waste, domestic water and natural gas.

Adams county correctional facility

This was a very intricate project working in a occupied correctional facility dealing with high security along with complex plumbing systems. The scope of his project was turning a existing correctional wing into a mental health facility with all new plumbing in cells and common areas.

Amazon hub warehouse

Mile high surgical center

This brand new 2 story steel building was designed on a cupolex system for sever radon mitigation making are underground critical to get right the first time to avoid costly back charges. This project was a complete plumbing, hydronic, steam along with subbed out med gas that I over saw.

Ebenezer assisted living phases 2, 3a, 3b and 4

Addition of around 130 new rooms for long term patients in multiple phases spread out over 3 years. This was a complete plumbing install utilizing uponor pex and pvc pipe.

Dunston middle school

This was a 2 story new addition adding 8 new science classrooms to a existing school. this project was a complete plumbing and hydronic piping install requiring a live 8" chilled pipe freeze to cut in new isolation valves and tees for addition.

General contractors I have worked with

PCL, Shaw, Mortenson, Wayner, Fransen and Pittman, Swinerton, G E Johnson along with others

  • Handled scheduling of subcontractors and staff to complete projects within required timeframes.
  • Conducted regular site inspections to assess progress, address issues, and maintain quality control throughout the project lifecycle.
  • Worked with inspectors, workers and unions, to conduct weekly status updates.
  • Monitored project milestones and adjusted scheduling to meet deadlines.
  • Compiled daily field report, detailing all key activities and outlining project progress for stakeholders.
  • Developed detailed project scopes, schedules, budgets, and performance metrics to guide successful completion of assigned projects.

Lead Installer/Plumbing Foreman

Mountain Air Mechanical
02.2014 - 04.2015
  • Improved customer satisfaction by providing efficient and accurate installations.
  • Reduced installation errors, implementing thorough quality control measures.
  • Mentored junior installers
  • Established strong relationships with clients through excellent professionalism throughout the entire installation process.
  • Conducted post-installation inspections, guaranteeing customer satisfaction and addressing any concerns promptly.
  • Streamlined installation processes for increased productivity and faster project completion.

Installer

Rk Mechanical
01.2014 - 02.2014

Completed high quality installs for the Charles schwab corporate office complex in Lone Tree Co

Foreman

Linden Mechanical
02.2012 - 01.2014

This was a family owned company we started for specific work dealing with over 900 quadplex military housing and military maintenance buildings all being new construction. This company was between me and my father along with one of my brothers.

Foreman

Finebuilt Construction
03.2009 - 12.2012

This job specifically taught me the means and methods of a construction site. Not just plumbing and mechanical but the whole scope of a new construction job. This company was a high end custom builder that built homes in the Yosemite national park for very well to do clients. I was the plumbing foreman and dealt with all aspects of plumbing for a custom residential building. when I was not plumbing, you could find me doing rough framing, finish framing, electrical and many other tasks since we provided about 70% of the work in building a house.

Education

High School Diploma -

Arbor View High School
Las Vegas, NV
06-2008

Skills

  • New construction commercial plumbing ( high rise, government, restaurants, corporate, etc)
  • Hydronic piping systems ( VAV's, snow melt, base board, boilers, etc)
  • Current Colorado plumbing masters license MP03001946
  • Pipe fitting and erection ( sch40 & 80 welded pipe of sizes up to 12")
  • Excavation ( mini excavators up to standard size, front loaders, compaction equipment)
  • Rigging certified ( forklifts, mobile and tower cranes)
  • Site inspections
  • Deadline management
  • OSHA 30 trained
  • Project safety
  • Safety procedures
  • Quality control
  • Blueprint interpretation
  • Building codes
  • Construction protocols and standards

Timeline

Project Superintendent

Colorado Mechanical Systems
05.2015 - Current

Lead Installer/Plumbing Foreman

Mountain Air Mechanical
02.2014 - 04.2015

Installer

Rk Mechanical
01.2014 - 02.2014

Foreman

Linden Mechanical
02.2012 - 01.2014

Foreman

Finebuilt Construction
03.2009 - 12.2012

High School Diploma -

Arbor View High School
Nicholas Linden