Summary
Overview
Work History
Education
Skills
Certification
Timeline
Dam Instrumentation
Tunnel Instrumentation
Highway Instrumentation
Generic

David Olguin

Thornton

Summary

Professional estimator with proven track record in the construction industry. Expertise in delivering precise and reliable cost projections for large-scale projects. Known for strong team collaboration and results-driven approach. Adaptable to changing project needs. Key skills include cost analysis and project scheduling.

Overview

42
42
years of professional experience
1
1
Certification

Work History

Senior Estimator/ Project Manager / Instrumentation Specialist

Colorado Engineering and Instrumentation, Inc.
03.1990 - Current
  • Evaluated project requirements to determine accurate cost projections.
  • Reviewed and signed subcontracts to establish clear agreements and mitigate project risks.
  • Coordinated schedules with prime contractors, drilling contractors, and subcontractors to ensure timely project progression. with prime contractors, drilling contractors, and subcontractors.
  • Secured essential equipment and materials for geotechnical projects to ensure operational readiness., Installation and termination of the following Geotechnical Instrumentation
  • 1. Geokon
  • A. Vibrating Wire Piezometers
  • B. Strain Gages
  • C. Crack Meters
  • D. Extensometers
  • E. Settlement Sensors
  • F. Pressure Cells
  • G. Inclinometers
  • H. Tilt meters
  • I. GeoNet Data Loggers
  • J. Handheld Readouts
  • 2. Durham Geo Slope Indicator
  • A. Inclinometers
  • I. Casing installation
  • Ii. Manual readings
  • B. Vibrating Wire Piezometers
  • C. Settlement Systems
  • D. Water Level indicators
  • 3. RST Instruments
  • A. Inclinometers
  • I. Casing Installation
  • Ii. Manual Readings
  • B. In-Place Inclinometers
  • C. Vibrating Wire Piezometers
  • 4. Measurand
  • A. Shape Arrays accelerometers (SAA’s)
  • 5. Canary Systems
  • A. Data Logging Equipment

Lab Technician

Steffen Robertson and Kirsten
01.1985 - 01.1990
  • Duties: sieve analysis, Atterberg, hydrometers, proctor compaction tests and moisture content samples.
  • Input all data received from associated test into computer.
  • Produced graphical representations of finalized data for analysis.

Education

Civil Engineering Technology - Civil Engineering

Red Rocks Community College
Lakewood
01-1997

Skills

  • Bid preparation expertise
  • Cost estimation expertise
  • Preconstruction services
  • Process optimization
  • Estimate preparation
  • Material takeoff techniques
  • Quantity take-offs
  • Cost control strategies
  • Cost management
  • Budget development
  • Budget planning
  • Change order management
  • Contract negotiation
  • Value engineering analysis
  • Construction estimates
  • Subcontractor coordination
  • Vendor relationships
  • Preconstruction services
  • Project planning
  • Project scheduling
  • Bid management
  • Project planning
  • Obtaining bids
  • Cost control estimates
  • Bid acquisition
  • Cost control strategies
  • Team collaboration
  • Multitasking Abilities
  • Cost management
  • Multitasking
  • Client consultation
  • Risk management
  • Reliability
  • Self motivation
  • Product knowledge
  • Time management
  • Construction safety
  • Industry standards
  • Document review
  • Budget planning
  • Cost management

Certification

  • 8 Hour, Annual Renewal Hazardous Waste Operations, 1990 – 1998
  • 40 Hours, Hazardous Waste Operations, May 1988
  • 24 Hours, Hazardous Waste Operations, May 1988
  • 24 Hours MSHA Training August 2021
  • QA/QC Soils Laboratory Technician
  • Confined Space Training, Feb. 2007
  • Fall Protection, April 2019

Timeline

Senior Estimator/ Project Manager / Instrumentation Specialist

Colorado Engineering and Instrumentation, Inc.
03.1990 - Current

Lab Technician

Steffen Robertson and Kirsten
01.1985 - 01.1990

Civil Engineering Technology - Civil Engineering

Red Rocks Community College

Dam Instrumentation

  • Adobe Creek Dam Outlet Works (Las Animas, CO)
  • Responsibilities: Estimating, review and signing of subcontract procurement, installation and termination of all instruments.
  • Instrument leads in terminal boxes then automating all vibrating wire instruments to a Geokon wireless data logger (GeoNet)
  • Instruments used: Vibrating wire piezometers, vibrating wire weir monitors, Standpipe piezometers, wireless data logging equipment (GeoNet)
  • Prado Dam (Corona, CA) - Dam enlargement
  • Responsibilities: Terminated instrument leads into multiplexers, pulling wires and splicing
  • Instruments used: vibrating wire strain gages, vibrating wire load cells, inclinometers, and data loggers
  • Canton Dam (Canton, OK) - Spillway stabilization
  • Responsibilities: Installation and termination of twenty-seven multi-point extensometers
  • Instruments used: multi-point extensometers, Geomation data loggers
  • Silver Basin Dam (Morenci, AZ) – WSB Dam/Reservoir/Stockpile
  • Responsibilities: Estimating, review and signing of subcontract, procurement and installation and termination of all instruments.
  • Instruments used: Vibrating wire piezometers, Standpipe piezometers, Shape Array Accelerometers (SAA’s), and monuments
  • Aurora Reservoir (Aurora, CO)
  • Responsibilities: Installation and upgrading twenty-five standpipe piezometers to Vibrating Wire piezometers with Geokon (GeoNet series mesh logging System). Upgrading and automation on 2 Inclinometers to Shape Array Accelerometers (SAA’s).
  • Instruments used: Vibrating wire piezometers, Shape Array accelerometers (SAA’s), Wireless data logging equipment (GeoNet)
  • Willow Creek Dam/Pearl Lake Dam (Steamboat Springs, CO)
  • Responsibilities: Procurement, Installation and termination of all instruments.
  • Instruments used: Vibrating wire piezometers, Standpipe piezometers, Monitoring points, Sutron bubblers, Canary Systems data loggers.
  • Chimney Hollow Reservoir (Loveland, CO) 2019-2025
  • Responsibilities: Estimating, reviewing and signing of subcontract, procurement and installation and termination of all instruments.
  • Instruments used: Vibrating wire piezometers, Standpipe piezometers, Shape Array accelerometers (SAA’s) horizontal and vertical , Asphalt Monitoring points, Survey Monuments, Monitoring points Arrays, Weir Monitors, Canary Systems data loggers.

Tunnel Instrumentation

  • Wolf Creek Tunnel (South Fork, CO) 2005-2007
  • Responsibilities: Installation of all instruments and terminating instrument leads in terminal boxes, monitoring of inclinometers.
  • Instruments used: multi-point borehole extensometers (MPBX), Tape Extensometer, Pressure Cells, Inclinometers
  • Veteran’s Memorial Tunnels (Idaho Springs, CO) 2013-2015
  • Responsibilities: Estimating, review and signing of subcontract, procurement and installation of all instruments and terminating instrument leads in Data logging Equipment.
  • Instruments used: multi-point borehole extensometers (MPBX), Crack meters, Canary Systems Data loggers.
  • 39th Avenue Greenway & Park hills drainage (Denver, CO) 2018-2020
  • Responsibilities: Estimating, review and signing of subcontract, procurement, installation and monitoring of all instruments.
  • Instruments used: multi-point borehole extensometers (MPBX), Inclinometers, Monitoring point arrays, utility monitors.
  • Wise Water connection for Stone Gate Village (Greenwood Village, CO) 2016-2017
  • Responsibilities: Estimating, review and signing of subcontract, procurement and installation and monitoring of all instruments.
  • Instruments used: multi-point borehole extensometers (MPBX), Utility monitors, monitoring point arrays.

Highway Instrumentation

  • Legacy Parkway (Salt Lake City, Utah) 2007-2008
  • Responsibilities: Installation and termination of the following instruments
  • Vibrating Wire piezometers, Inclinometers, manometers
David Olguin